 |

- Alenaio Stream, Stabilize Embankment, Hilo, Hawaii $150,000 (approx.)
- Demolition of Housing Areas 300 & 600, Ft. Shafter
- Improvements to WORF
- Landfill Run-on/Run-off Controls, KMCBH
- Replace Fence & Signs Waikane Valley Impact Area, Oahu,HI
- Provide Tactical Air Navigation Signs at airfield, KMCBH
- Building 1342 Addition, Fort Kamehameha, Hickam AFB
- Renovate Quarters A, Hale Alii, Pearl Harbor
- Renovate Code 100 Offices, First Floor, Bldg. 475, FISC, Pearl Harbor.
- Structural Repairs to Bldg. 405 & 406, Makalapa, Pearl Harbor, Hawaii
- Construct Pavilion, Iroquois Point, Oahu, HI
- Replace Fence with automatic gate, Bldg. 1, Camp Smith, HI
- Replace High-Bay Lighting Fixtures, Bldg. 1090 & Bldg. 1404, KMCBH.
- Replace 4" Waterline, Hale Alii, Pearl Harbor, Hawaii
- Repair Quarters C, Hale Alii, Pearl Harbor, Hawaii
- Replace Aeration Blower, WWTP, Fort Kamehameha, Hickam AirForce Base
- Remove Insulation and Install Fire Protection, Navy Hale Keiki School, Pearl Harbor
- Pave Parking Lot, Navy/Marine Golf Course, Moanalua
- Repair Waterfront Latrine, Bldg. 387, PHNSY
- Provide Maintenance Dredging at Wharves M3-M4 & S1-S8, P.H.
- Replace Entrance Door, Bldg. 166, Pearl Harbor
- Construction and Erosion Control
- Demolish & Remove concrete pier & bunker
- TASK ORDER #1-Pave Parking Lot, Navy Marine Golf Course
- TASK ORDER #2-Replace Entrance Door, Bldg. 166, Pearl Harbor
- TASK ORDER #3-Repair waterfront Latrine, Bldg. 387, PHNSY
- TASK ORDER #4-Maintenance Dredging at Wharves M3-M4 & S1-S8, Pearl Harbor
- TASK ORDER #5-Replace Demolition, units 184-186, Pearl City Peninsula
- TASK ORDER #6-Modify Bldg. 372, Makalapa Volcano Room, Pearl Harbor
- TASK ORDER #7-Renovate Quarters 39, Makalapa
- TASK ORDER #8-Replace Kilo Docks SWAACAAS, PHNSY
- Parking Lot Lights @ the Center for Aging, TAMC
- Skateboard Facility and Site Improvements
- Construct Entry Walls, Castle & Cooke Renaissance, LLC
- Installation of Pedestrian Walkway & Replace Lights, Trimble Road, Schofield Barracks.
- Aliamanu Crater Electrical Trenching
- Renovate Honolulu Poi Company, Hart Street, Oahu, Hawaii
- Eddie Fan Residence $800,000 (approx.)
- New Residence for M/M Craig Tottori
- New Residence for Pacific Clothing Waialae Iki V
- New Residence for M/M Edmund Farm
- New Residence for M/M Anthony Goo, Kaneohe
- New Residence for M/M Dennis Chung
- Residence for M/M Katsuki at Waialae Iki, Honolulu
- Manoa Residential Re-roofing
- Hoolai St Residential Remodeling
- New Kitchen renovation for Mrs. Helen Iwatani
- New Kitchen for M/M William Richardson Esq.
- Renovation and Exterior Finish for Watanabe Family
- Renovation for 3 Bathrooms for M/M James Yamashita
- Bedroom, Bath and Kitchen Addition for Ruth Fukunaga
- Apartment Renovation for Mrs. Robertson at Waikiki
- Saito Residence Work includes demolishing an existing patio, repairing termite damaged beams, and building a new enlarged patio with new screened walls and door. Contract Value $25,000 (approx.)
- Privacy Fence, Pearl City Location Pearl City, Oahu, Hawaii. Contract Value $420,000 (approx.)
- Lee Residence
- Richardson Res
- Fuel Equip. Storage Facility, KMCBH The work includes the construction of a single story storage building, reinforced concrete foundations, ground slab and beams, prestressed concrete planks with concrete topping, concrete unit masonry walls and columns, modified bituminous sheet roofing on rigid roof insulation, sheet metal work, steel doors, painting, aluminum jalousie windows, electrical work and incidental related work. The work also includes concrete sidewalk, and connecting electrical utilities. Location Marine Corps Base Hawaii, Kaneohe Bay, Oahu, Hawaii. Contract Value $188,000 (approx.)
- Women's Bathroom, KMCBH (Design-Build) Work includes the construction of a single story bathroom building, reinforced concrete foundations, ground slab and beams, prestressed concrete planks with concrete topping, concrete unit masonry walls, modified bituminous sheet roofing on rigid roof insulation, sheet metal work, fiberglass reinforced plastic door, painting, solid plastic toilet partitions, metal wall louvers, solid plastic lockers, toilet and bath accessories, plumbing, electrical work, and incidental related work. The work also includes connecting of utilities, demolition of structure, and incidental site work. Location Marine Corps Base Hawaii, Kaneohe Bay, Oahu, Hawaii. Contract Value $320,000 (approx.) Completion Date June 30, 2000
- High Performance Kites Store, Ala Moana Shopping Ctr
- Replace Puuloa Echo Pistol Range Work includes demolishing an existing wood framed structure and replacing it with a new building. The new Firing Range Building will be a 2465sqft open wooden structure that is a replica of the old one. The new building will be supported by new concrete footings while reusing the existing concrete slab. Work also includes a new drinking fountain, new electrical and the installation of two new loudspeakers. Contract Value $96,000 (approx.)
- Install Traffic Signals @ Tripler AMC
- Site Prep for PACMERS - Ft. Shafter/Redhill (Design-Build) Special Construction. Location Ft. Shafter, Oahu, Hawaii. Contract Value $340,000 (approx.) Completion Date June 30, 2000
- Site Prep for PACMERS - Mt. Kaala Special Const (Design-Build). Location Mt. Kaala, Oahu, Hawaii. Contract Value $140,000 (approx.)
- Construct Sidewalk Side @ Valkennburgh
- Replace Pool Lights, Gutters and Expansion Joints, Richardson Pool, Schofield Barracks
- Replace Grease Traps
- Replace Electrical System, Bldg. 986, Schofield Barracks
- Repair Electrical Service, Military Police Station, Bldg. 118, Fort Shafter
- Replace Light Fixtures, Stoneman Field, Schofield Barracks
- Install Sectional Switch, Fort DeRussy, Oahu, Hawaii.
- Life Skills Clinic Replacement, Hickam Air Force Base.
- Construct Visitor Control Center, Tripler Army Medical Center, Oahu, Hawaii
- Renovate Bldg. 578C, Richardson Pool Pump Room, Schofield Barracks, Oahu,Hawaii
- Renovate Bldg 525, 3rd Flr, Ft. Shafter Complete renovation of 20,000sf. Location Ft. Shafter, Oahu, Hawaii. Contract Value $2,500,000 (approx.)
- Spill Containment Fuel Truck Load Station (Design-Build) The work includes construction of three fuel spill containment structures with associated appurtenances to include concrete pavement with concrete curbs around the perimeter to contain fuel in the event of a spill. The pavement shall be sloped to a low point where a drainpipe and valve will be located. A drain pipe and valve (housed within a concrete box) to allow for drainage of rainwater. Concrete speed bumps with very gradual slopes located at the two ends to allow vehicles to enter/exit the containment area. Location Marine Corps Base Hawaii, Kaneohe Bay, Oahu, Hawaii. Contract Value $155,000 (approx.) Completion Date June 30, 2000.
- Repair Roofs, USARC, Hilo New metal and B.U. Roofs. Location Hilo, Hawaii. Contract Value $250,000 (approx.) Completion Date June 30, 2000.
- Renovate Bldg 547, Wheeler Army Air Field Base
- Repair Leaking Roofs, Bldg 535 & 536, Ft Shafter Gas Station
- Various Repairs to US Coast Guard Family Housing
- New Door Ft Shafter (Bldg T-101)
- Renovation for New Showroom and Warehouse, Futon's Etc.
- Warehouse Addition at HPC, Ltd., Honolulu Poi
- Various Repairs at 7-Eleven Hawaii
- Various Repairs for the US Post Office at Airport
- Renovation for Krater Sports Store at Waikiki
- Repairs to Hawaii Air National Guard Armory at Hickam AFB
- Concrete Sidewalk & Lanai at KK Housing, US Coast Guard
- Office Renovation for Ala Moana Produce
- Install Handicap Ramp, Camp Smith To install a concrete handicap ramp with False Rock cladding on CMU walls and metal hand-railing. The ramp is located at the front entrance of CINCPAC Headquarters. Location Camp Smith, Oahu, Hawaii. Contract Value $48,000 (approx.) Completion Date June 30, 2000.
- Maui Swale Drainage
- Bldg. 222 Generator
- Termite Damaged Beam Bldg.404
- Recaulk Paved Area
- Install Glass Doors @ Copier Area
- Midas Rack
- Signs At Makalapa
- Recarpet Bldg. 2D
- Repairs to INS Honolulu District Office
- Building 475
- Maui Wash Rack
- Renovate Area 9000 FHU to UPH
- Sewer Line, Ford Island
- Fence, Bldg 6
- Lead Abatement, Halawa Drive
- Redesign Intersection
- Kunia Tunnel Flooring
- Reroute Drain Line
- Replace Windows in B-1096 KMCBH
- Renovate Second Floor
- CILHI Paving
- Construct Technical Library Bldg. 1757 2nd
- Install A/C B661, Sub base
- Tank Replacement @ West loch
- Paint Exterior, Bldg. X-11 @ Pearl Harbor
- Signs & Graphics FISC 1900
- Install A/C Bldg. 216 @ KMCBH
- Convert Storage Area Bldg. 1554 @ Ft. Shafter
- Recarpet/Repaint Bldg. 1554 @ Ft. Shafter
- Fragment Retention Bldg. 140 @ Barbers Point
- Excavate Fuel Lines at Halawa Gate, Pearl Harbor
- Replace Insulation to HVAC Piping, KMCBH
- AHU Bldg. 661
- Replace Tennis and Basketball Court Playing Surface, Camp Smith
- Various Repair to Maui USARC Bldg. 1550
- Install 3-Ton Hoist, Bldg 4036, KMCBH
- Replace Steel Stairways, Bldg. 4
- Repair/Renovate Existing Chapel Bldg. 3373
- Renovate Restroom, Bldg. 475
- Repair & Repaint Admiral's Pier, Ford Island
- Elect. for Syst. Furniture, Bldg. 525, 3rd Flr
- Site Prep for Paint Spray Booth, WAAF
- Replace Ceiling Tiles @ Schofield Army IDQ
- Quad I Air Conditioning Replacement
- The Waste Oil Reclaim. Facility (WORF)
- Design/Renovate Customer ServiceArea, Bldg. 475, Pearl Harbor
- Replace Tennis and Basketball Court Playing Surface, Camp Smith
- Replace Insulation to HVAC Piping, KMCBH
- Paint Exterior and Repairs to Bldg. 258, Makalapa
- Replace Steel Stairways, Bldg. 258, Makalapa
- Repair Peeling Wall Paper, Bldg. 603, Westloch
- Install Vinyl Siding, Bldgs. A4,A8,A13 & A7, PWC.
- Disassemble Loading Dock, Bldg. 995, ASDS Facility, Pearl Harbor, Hawaii
In addition Alan Shintani, Inc. also supports many other general contractors in furnishing subcontract work for unique and/or difficult finish carpentry, concrete and masonry work. These include:
- Pacific Island Air Conditioning, Inc.
Ft. Derussy, A/C, Army Museum
Ford Island, Cooling Tower Support
- Aloha Painting, Inc.
Exterior Painting, Tripler Army Medical Center
Architect Hideo Kobayashi was the director of this extensive project that involved State archaeologists to skilled finish carpenters working under strict federal specifications.
At the Rededication ceremony of the Royal Mausoleum Chapel in November 1987, both Governors Ariyoshi and Waihee, senators and legislators were in attendance of the auspicious occasion.
|